Stones River Water Treatment

Posted in Water Treatment

stones river water treatment murfreesboro tn

This project renovated and expanding the existing facilities to include a new Filter Building, new Finish Pumps and new Clarifier. The expansion required phased completion times to maintain the 24/7 operations of the plant. Expansion of the existing services. Motor control center upgrade. Expansion to the existing plant power distribution services. New parallel 900KW Generators for the emergency power distribution system upgrade.

FiberWeb Steam Plan

Posted in Industrial

fiber web steam plantThis design–build project provides steam for the FiberWeb manufacturing process. The power was provided from new Medium voltage switchgear sections that extended the existing 69kV Power House switchgear serving the entire plant. The service for the new facility was feed via overhead line installed in existing support structure. The new service feeds the Steam Generators, Cooling Towers and Pumps. A small office space and storage room completes the facility.

St. Cecilia

Posted in Historical

stc1

Historical Renovation and Expansion.

The project included new dormitories and chapel, renovation of kitchen, dining, meeting space, entrance, library, new power distribution, lighting and fire alarm systems design build project.